- Find the amount of cooling air required in m3 per second at the inlet temperature of 25OC for a 25000KVA alternator working at full load. The efficiency is 96% and the power-factor is 0.87. The temperature of air coming out of machine is 50OC. Determine also the amount of hydrogen required with the same data.
- Discuss, briefly, about the “Frame Size” and “Standard Frames”.
- Explain heating and cooling process of electrical machines also define heating & cooling time constants.
- What do you understand by the term “Impregnation of winding”?
- Does the selection of current density Amp /mm² in the design of electrical machines, depend on duty-cycle of the respective machine? Explain in brief.
- Justify the statement, “By exceeding the rate of cooling, the overload capacity of an electrical machine can be enhanced.”
This comment has been removed by a blog administrator.
ReplyDelete
ReplyDeleteRead More Electronic Device & Circuits Engineering MCQs
Read More Microprocessor Engineering MCQs
Read More Microwave Engineering MCQs
Read More Network Theory Engineering MCQs
Read More Electronics & Communication Engineering MCQs